Projects

Our project portfolio

Steel construction
across industries.

Browse our project references in China and overseas. Explore project scope, structural solutions and construction information through the case studies below.

Yingxian, Shanxi · Infrastructure

Great Wall No. 1 Tourist Highway — Phase II

An 18.67 km tourist highway linking Yingxian High-Speed Rail Station, the Sanggan River and the Yingxian Wooden Pagoda.

Project details
Project section
High-Speed Rail Station–Sanggan River–Yingxian Wooden Pagoda Section (Phase II).
Route
13.095 km of new construction, 4.102 km of widening and 1.473 km utilizing existing roads.
Technical standards
Class III highway; design speed of 40 km/h; roadbed width of 8.5 m.
Construction
Subgrade and pavement, bridges, culverts, intersections, safety and drainage works, and tourism support facilities.

Thailand · Industrial plant

Suntrust Manufacturing (Thailand) New Plant Project

Approximately 13,000 m² across Phase I and Phase II, including two workshops, an office building and a gatehouse.

Project details
Building area
Approx. 13,000 m².
SWS scope
General construction contracting, including building, structure, MEP and outdoor works.
Schedule
October 2024–August 2025; completed.

Thailand · Special alloy production

Shengquan New Materials (Thailand) Special Alloy Project

An approximately 15,000 m² production complex with workshops, warehouses and supporting buildings.

Project details
Building area
Approx. 15,000 m².
SWS scope
Steel-structure subcontracting, office-building civil and fit-out works, and workshop indoor flooring.
Schedule
May 2024–July 2025; completed.

Thailand · Industrial plant

Ecosource Environmental Technology (Thailand) No. 2 Factory Project

An 8,377.96 m² single-storey steel-structure plant, with SWS responsible for general construction contracting.

Project details
Building area
8,377.96 m².
Structure
Single-storey steel-structure plant.
SWS scope
General construction contracting.
Schedule
Started in February 2026; planned completion in September 2026.

Côte d’Ivoire · Commercial development

Cote d'Ivoire Commercial City Project

SWS undertook two steel-structure plant buildings with a combined area of approximately 13,000 m².

Project details
Overall development
Approx. 100,000 m² in total.
SWS construction scope
Two steel-structure plant buildings, totaling approx. 13,000 m².
Developer
Côte d’Ivoire Kejian Real Estate.
General contractor
Jiangsu Zhenhuai Construction Co., Ltd.
Schedule
April 2025–June 2026; completed.

Kibaha, Tanzania · Production line upgrade

Tanzania Beixin Powder and Gypsum Board Production Line Upgrade Project

A 14,235.37 m² project comprising eight building units with portal steel frames and independent concrete foundations.

Project details
Project
100,000 t/y powder and 15 million m²/y gypsum board production line upgrade.
Location
Beixin Building Materials plant, Kibaha District, Coast Region, Tanzania.
Building area
14,235.37 m².
Dimensions
Maximum building height: 18.025 m; maximum span: 37 m.
Structure
Portal steel frame with independent concrete foundations; 50-year design service life.
Schedule
September 20, 2025–April 20, 2026.

Projects 1–6 of 23

Kenitra, Morocco · Battery manufacturing

Gotion Morocco Power-Battery Gigafactory · Steel Structure Works

The Morocco branch of SWS Group undertook the main steel-structure works for Gotion’s power-battery gigafactory.

Project details
Location
Kenitra Atlantic Free Zone, Morocco.
SWS scope
Main steel-structure works for the industrial plant.
Plant requirements
Long-span space, production-line continuity, structural precision and construction efficiency.
Production facilities
Cell, PACK, cathode and anode production lines.

Tangier, Morocco · Battery materials

BTR Morocco Cathode & Anode Materials Base · Steel Structure Works

SWS Group’s Morocco branch undertook steel-structure plant works for BTR’s integrated cathode-and-anode materials base.

Project details
Location
Mohammed VI Tangier Tech City within the Tangier Free Zone, adjacent to Tanger-Med port.
SWS scope
Steel-structure plant detailing and construction.
Plant functions
Granulation, graphitization, sintering, warehousing and supporting logistics.

Tai’an, Shandong · Sports venue

Tai'an Sports Center

A large-scale stadium steel structure project and a landmark building for the city.

Weihai, Shandong · Sports venue

Weihai Gymnasium & Badminton Hall

Long-span stadium steel structure design and construction.

Foshan, Guangdong · Education

ECNU-Affiliated Shunde Midea School

The first public school jointly developed by the Shunde District Government and East China Normal University; Phase I & II construction.

Zambia · Hangar

Zambia Air Force Hangar

An overseas military hangar steel structure project that showcases our craftsmanship and innovation.

Projects 7–12 of 23

Chonburi, Thailand · Industrial park

Lezhitai Thailand Industrial Park Phase II Project

A 21,568.28 m², two-storey steel-structure industrial plant in Pinthong 5 Industrial Estate.

Project details
Client
Qingdao Lezhitai Industrial Co., Ltd.
Building area
21,568.28 m².
SWS scope
General construction contracting.
Schedule
Started in February 2026; planned completion in September 2026.

Ayutthaya, Thailand · Building materials

Beixin Building Materials Thailand Gypsum Board Production Line Project

Approximately 46,000 m² of production facilities, warehouses and supporting works for gypsum board manufacturing.

Project details
Production lines
40 million m²/year paper-faced gypsum board; 3,000 tons/year light-steel keel; 4 million m²/year decorative gypsum board.
Building area
Approx. 46,000 m².
SWS scope
Steel-structure subcontracting, indoor flooring, outdoor pavement and ground works, and landscaping.
Schedule
August 2024–July 2025; completed.

Thailand · Supporting facilities

InnoLight Thailand Phase IV Canteen Building Project

An approximately 5,000 m², five-storey steel-frame canteen building for InnoLight Technology (Suzhou) Ltd.

Project details
Building area
Approx. 5,000 m².
Structure
Five-storey steel frame.
SWS scope
General construction contracting, including foundation, structure, fit-out, MEP and outdoor works.
Schedule
December 2024–August 2025; completed.

Landscape project

Chengjian Future Health Historic-Style Landscape Project

SWS project portfolio

HEBEI

Sanxia project

Hebei · Project reference

Hebei Sanxia Project

Technology park

Huawei Jiantao Technology Park Plant Project

Projects 13–18 of 23

Jinan · Project reference

Jinan Zhennuo Project

Longkou · Industrial plant

Longkou Daoen Siweite Plant Project

Shandong · Industrial project

Shandong Haichuan Lightweight Technology Co., Ltd. Project

Shuocheng · Education

Shuocheng District No. 1 Middle School Expansion Project

Yantai · Industrial park

Yantai Jinhong Industrial Park Project

Projects 19–23 of 23

Discuss your next project.

Share your project location, building requirements and available drawings with our team to start a conversation about your steel structure needs.

Let’s Discuss Your Project

Tell us about your steel structure project or product requirements.

Contact Form Demo